Warning: Use of undefined constant php - assumed 'php' (this will throw an Error in a future version of PHP) in /home/customer/www/hansfordecon.com/public_html/wp-content/themes/bridge-child/page-casestudies.php on line 1
City of Fernley Water and Wastewater Rate Study - Hansford Economic Consulting

Case Studies

City of Fernley Water and Wastewater Rate Study

The purpose of this Water and Wastewater Rate Study (Study) is to determine the level of funding required over the next five years to adequately fund the water and wastewater utility systems.

The City’s mission is to first and foremost provide the residents and businesses of the City with clean, safe potable water and a reliable wastewater system that meets State and Federal regulatory requirements; second, protect and sustain economic growth, third to protect its water resources and water rights, fourth to manage and maintain the utility systems infrastructure (assets) to be fiscally responsible to current and future residents, and fifth to support public safety (primarily fire defense).